
BP2 RIPS Panels are the world's only fully variable Structural Concrete Insulated Panel — patented, engineered, and designed under ACI 318. 33% less concrete. No conventional rebar. Built faster, anywhere in the world.
Enter your details and our team will send you the technical overview, project pipeline, and partnership options.
Trusted by builders and developers across North America
Concrete is the world's second most used material, and construction drives nearly 40% of global emissions — yet its cost and complexity keep it out of reach for the communities that need it most.
Conventional concrete uses more material than needed, then wastes it at the edges, not the solid core. There is a better way to build.
Portland cement is one of the largest sources of industrial CO₂ — roughly 8% of global emissions. It isn't just efficient, it's essential.
The communities that need resilient infrastructure most can't afford conventional construction. The solution is a simpler, faster, locally manufacturable system.

Engineered truss orientation tailored for high-load walls, roofs, or floor spans.
High-density insulating foam core surrounded by structural wire mesh and cementitious skins.
Replaces massive tilt-up slabs with 33% less concrete while surpassing structural load standards.
Variable wire mesh sizing and gauges to match exact seismic and wind engineering demands.
A precision composite of an insulating foam core, welded-wire trusses, and thin cementitious shells on each face. The result is a wall, floor, or roof system that matches or exceeds the structural performance of solid concrete at a fraction of the weight and material load.
BP2 RIPS stands apart with complete variability. Every component can be engineered to project needs. Protected by a US patent, it is the only SCIP system fully designable under ACI 318 — eliminating approvals and delays and ready to specify, permit, and build today.
The only SCIP system designable under the concrete code referenced by the International Building Code.
The only SCIP manufacturer capable of varying every element of the panel.
Than conventional tilt-up construction, verified by independent structural engineers.
Compliant with 2021 IECC for above-grade mass walls in climate zones 1 through 7.
"We are building toward something much larger than a panel system. The goal is a replicable model for self-sustaining communities built around local manufacturing, durable infrastructure, and long-term economic independence."

A 1,200 square foot accessory dwelling unit in Los Angeles County is the first structure built with BP2 RIPS panels — currently under construction, fully permitted under one of the most demanding building code jurisdictions in the United States. It is a living demonstration platform where every design decision serves as a measurable performance data point.

A 127-unit residential development, financed and moving forward, with construction lending committed for the first BP2 RIPS residential development at scale.
From a permitted ADU in Los Angeles County to a 127-unit residential development in Idaho, the pipeline is just beginning.

Mark David Heath is the inventor and patent holder of the BP2 RIPS system and Chief Technology Officer of Blue Millennia. Over 30+ years he has delivered construction and engineering projects across the United States, Africa, the Middle East, and Europe.
His patent, US Patent 11,291,179 B2, covers a structural panel built from two spaced thin-shell cementitious skins joined by a truss matrix — where the truss, the face mesh, the insulating core, and the thickness of each skin are all independently selected to meet the structural loads placed on them. That variability is what no other SCIP manufacturer in the world can do, and it is what makes BP2 RIPS fully designable under ACI 318.
Before Blue Millennia, Mark served as Director of Technology at Green Sandwich Technologies and as Operations Vice President and Director at Norwest Group International.
"The approval barrier that stops most new building systems in their tracks? We're already past it."
— Mark David HeathWant to hear it from Mark directly? Watch the full story on YouTube.

Principal Broker, 25+ years delivering residential and multifamily developments across the Mountain West and California. Projects worth tens of millions.

Building systems, market strategy, and the bridge between advanced construction technology and real-world adoption.
Five quick facts for partners doing their due diligence — every one independently verifiable.
US Patent 11,291,179 B2The only SCIP system with full element variability.
ACI 318 DesignableThe only SCIP system fully designable under ACI 318, no proprietary testing required.
PE-Stamped MethodologyReviewed and stamped by two independent licensed PE firms.
U-Factor 0.0712021 IECC compliant across climate zones 1 through 7.
Under ConstructionCurrently permitted and under construction in Los Angeles County.
BP2 Panels and Blue Millennia work with licensed engineers, energy specialists, industry advisors, and development partners supporting the company's technical, regulatory, and commercial growth.
Licensed structural and mechanical engineering firm based in Idaho Falls, Idaho. Provided the PE-stamped U-Factor calculation and energy code compliance letter for the BP2 RIPS system. Lead structural engineering partner for BP2 RIPS design methodology.
Licensed structural engineering firm based in Shelley, Idaho. Provided the independent PE review and confirmation of the ACI 318-based SCIP design methodology, conducting the head-to-head structural comparison of BP2 RIPS against conventional Tilt-Up and TPS/EVGID systems.
Construction lending partner for the Monarch at Teton Meadows development, providing a $13,424,600 construction loan commitment for the first BP2 RIPS residential development at scale.
If you are a developer with a project that is a fit for BP2 RIPS construction, our team wants to talk, whether you are in early planning or ready to break ground.
The pipeline is real, the financing structures are in place, and the projects are moving. If you want to understand the investment opportunity behind this pipeline, start here.
Spec BP2 RIPS on your next project. Access the design resources, the engineering documentation, and the certified builder directory.
The technology is patented and proven. The first projects are under construction and fully permitted. The path from partnership to construction is clear, open, and moving.